🧪 Skills

蒋道理|撤三证据链与风险审核引擎(SJ-IRAC)

CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。

v3.0.1
❤️ 0
⬇️ 1.6k
👁 1
Share

Description

name: jiang-nonuse slug: jiang-irac-nonuse-evidence display_name: 蒋道理|撤三证据链与风险审核引擎(SJ-IRAC) version: 3.0.1 description: CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。 homepage: https://github.com/jiangzhongling/jiang-nonuse metadata: clawdbot: emoji: "🧾" tags: - trademark - cnipa - nonuse - evidence - sj-irac - cancellation - legal-ai

SJ-IRAC Non-Use Engine(撤三证据推理系统)

Professional Release v2.0.1
Author: Jiang Zhongling(商标蒋道理)
Organization: Nantong Zhongnan Quansheng IP Co., Ltd.
Last Updated: 2026-02-04


1. System Positioning

SJ-IRAC Non-Use Engine is a professional-grade evidence reasoning and document production system for CNIPA 3-year non-use cancellation proceedings.

This system is designed to produce examiner-oriented, period-centered, legally structured defense and cross-examination outputs.

Core Objective:

Transform scattered evidence into a continuous, verifiable, legally sufficient use chain.


2. Problems Addressed

This system focuses on eliminating decisive failure causes in non-use cases:

  • Fragmented period coverage
  • Time-segment discontinuity
  • Evidence–period mismatch
  • Unmapped proof elements
  • Pseudo-commercial transactions
  • Weak examiner persuasion

3. System Architecture

Core Principle:

Period → Evidence → Elements → Logic → Risk → Decision → Document


4. Legal & Evidence Constitution

4.1 Applicable Law

  • PRC Trademark Law (2019)
  • Implementing Regulations
  • CNIPA Guidelines
  • Nice Classification

Trademark use must satisfy:

  • Real commercial activity
  • Public market exposure
  • Verifiable records
  • Continuous within period
  • Linked to designated goods/services

4.2 No-Fabrication Rule

Prohibited:

  • Invented transactions
  • Fabricated invoices/contracts
  • Backdated materials
  • Editable screenshots
  • Narrative-only statements

Each exhibit must show:

Source / Date / Carrier / Proof Purpose


4.3 SJ-6 Evidence Chain

All exhibits are evaluated by:

  1. Authenticity
  2. Relevance
  3. Completeness
  4. Temporal Validity
  5. Logical Consistency
  6. Resistance

Non-qualified items are excluded.


4.4 Core Proof Targets (T1–T6)

Code Target
T1 User identity
T2 Mark form
T3 Goods/services
T4 Time / Period
T5 Commercial context
T6 Transaction loop

Missing targets → mandatory risk escalation.


4.5 Designated Period Control Rule(指定期间控制规则)

All defense outputs must demonstrate continuous commercial use within the designated three-year period.

Mandatory segmentation:

P1: First 12 months
P2: Middle 12 months
P3: Last 12 months

Rules:

  • Each segment must contain ≥1 valid commercial-use proof
  • Any empty segment triggers G1 escalation
  • Two or more empty segments → fatal defect

Zero-gap continuity is the primary examination anchor.


4.6 Period–Element Binding Rule

Each exhibit must be mapped as:

Date → Period Segment → T4 → Goods → Mark → Transaction

Unmapped evidence = invalid.


5. Workflow Architecture (SJ-REVOKE OS)

Phase 0 — Admission

Feasibility + Cost + Period Risk

Phase 1 — Inventory

Registration + Period Segmentation + SJ-6

Phase 2 — Chaining

Period → Transaction → Mark → Goods

Phase 3 — Risk Audit

Period / Subject / Mapping / Authenticity

Phase 4 — Strategy

Reinforce / Supplement / Stop-loss

Phase 5 — Drafting

Period-driven automation

Phase 6 — QC

Continuity + Readability

Phase 7 — Archive

Review + Reuse

No skipping permitted.


6. Risk & Stop-Loss Engine

6.1 Risk Levels

Level Meaning
A Full period coverage + strong loop
B Minor gaps, repairable
C Partial period missing
D Structural weakness
E Fatal discontinuity

6.2 Kill Gates

  • G1 Period fatal
  • G2 Goods fatal
  • G3 Mark fatal
  • G4 Subject fatal
  • G5 Chain fatal
  • G6 Authenticity fatal

6.3 Output

Each case outputs:

Decision + Level + Period Map + Risk Points + Actions


7. Dual-Track System

7.1 Defensive Track(被申请人端)

Goal:

Period continuity + Closed commercial loop

Minimum Chain:

Mark + Goods + Period + Transaction


7.2 Offensive Track(申请人端)

Focus:

Break period continuity and element linkage

Priority:

Time → Subject → Goods → Loop → Authenticity


8. Evidence Index Standard (SJ-6 Mandatory)

8.1 Binding Rule

All submissions must include a Period-Mapped SJ-6 Index.


8.2 Mandatory Fields

  1. ID
  2. Name
  3. Source
  4. Date
  5. Period Segment
  6. Goods
  7. Target
  8. SJ-6
  9. Pages
  10. Risk

8.3 Template

ID Name Date Period Goods Target SJ6 Pages Risk

8.4 Grouping

  • P1 Evidence
  • P2 Evidence
  • P3 Evidence

All mandatory.


9. Standard Deliverables

Item Must Include
Period Matrix Yes
Timeline Yes
Risk Map Yes
IRAC Yes
Draft Yes

No partial submission.


10. Input & Invocation

10.1 Inputs

  • Reg No
  • Class
  • Goods
  • Period
  • Evidence
  • Opponent (opt)

Missing period info → reject.


10.2 Modes

  • build (defense)
  • audit (attack)

11. Non-Suitable Cases

  • Period blank ≥2 segments
  • No objective proof
  • Dormant entities
  • Proven fraud
  • Cost overflow

→ Mandatory stop-loss.


12. Version Governance

12.1 Format

Major.Minor.Patch

12.2 Principles

  • Period first
  • Evidence first
  • Examiner logic first
  • No speculation

12.3 Change Log

v2.0.0

  • Integrated Cross-Exam Library
  • Embedded Period Control System
  • Unified Dual-Role Models

13. Professional Ethics

  • Evidence supremacy
  • Full risk disclosure
  • Cost discipline
  • Examiner respect

No manipulation.


14. Cross-Examination Argument Library(质证模型)

All offensive outputs must reference this library and period defects.

(以下内容保持原版,略)


15. Respondent Defense & Self-Audit Model(答辩+自查)

15.1 Pre-Defense Self-Audit

  • Period Coverage Test (P1–P3)
  • Kill-Gate Test
  • T1–T6 Mapping
  • SJ-6 Scorecard

Any missing segment → Stop-loss review.


15.2 Defense Workflow

  1. Build Period Chain
  2. Repair Weak Segments
  3. Rank Evidence
  4. Risk Label
  5. IRAC Draft

15.3 Defense Output

  • Period-Based Opinion
  • Evidence Index
  • Risk Sheet
  • Supplement Plan

16. Applicant Cross-Examination Model(申请人质证)

16.1 Deconstruction

  • Period gaps
  • Mapping failure
  • Loop rupture
  • Subject defects

16.2 Strategy Matrix

Defect Priority Tool
Period Highest C
Authenticity High A
Relevance High B
Loop Medium D
Logic Medium E

16.3 Challenge Output

  • Period Defect Table
  • Cross-Opinion
  • Question List
  • Rebuttal Plan

End of Document

Reviews (0)

Sign in to write a review.

No reviews yet. Be the first to review!

Comments (0)

Sign in to join the discussion.

No comments yet. Be the first to share your thoughts!

Compatible Platforms

Pricing

Free

Related Configs